AV-TM bid documents
Some of these documents are large and will take time to download.
- Executive Summary
- Report Cover
- Main Report
- Appendix 1A -Overview Plan AV-TM
- Appendix 1B - Overview Plan City Centre
- Appendix 1C - MSBC Bid Drawings
- Appendix 1C cover
- CTRACF-0700-240
- CTRACF-0700-241
- CTRACF-0700-242
- CTRACF-0700-243
- CTRACF-0700-244
- CTRACF -0700-245
- CTRACF -0700-246
- CTRACF-0700-247
- CTRACF-0700-248
- CTRACF-0700-249
- CTRACF-0700-250
- CTRACF-0700-251
- CTRACF-0700-252
- CTRACF-0700-253
- CTRACF-0700-254
- DH0245-100-DfT
- DHO245-101-DfT
- DHO245-102-DfT
- DH0245-103-DfT
- DH0245-104-DfT
- DH0245-105-DfT
- DH0245-106-DfT
- DH0245-107-DfT
- DH0245-108-DfT
- DH0245-109-DfT
- Appendix 1D - Related Developments
- Appendix 1D Cover
- Proposed Ashton Park Development
- Proposed BCFC Development
- Proposed BIA Development
- Appendix 1E - Low Cost Alternative Scheme Plan
- Appendix 2A - Transport Problems and Needs
- Appendix 2A(i) - JLTP 2008 Progress Review
- Appendix 2B - Scheme Development and Alternatives Considered
- Appendix 2B (i) - PT Corridor Options Report
- Appendix 2B(i) Cover
- Fig 3.1 Potential Busway Services
- Fig 4.2 Long list of options
- Fig 5.2 Reference Schemes
- Final Long List Report
- Appendix 2B (ii) - Options Short Listing Report
- Appendix 2B (iii) - Technology Options Report, 2007
- Appendix 2B (iv) - Technology Review, Final Report, September 2008
- Appendix 2B (v) - Lower Cost Alternatives Report
- Appendix 2C - Policy and Planning
- Appendix 2D - Written Endorsement from Regional Bodies
- Appendix 3A - Capital and Operating Costs
- Appendix 3B - Highway Model Validation
- 5048375 G-BATS3 V2.3 Highway LMVR
- Appendix 3B Cover
- Appendix A - RSI Survey Format
- Appendix B - Speed flow curves
- Appendix C - Zone System
- Appendix D - Growth Factors
- Appendix E - Screenline Calibration
- Appendix F - Flow Validation
- Appendix G - Journey Time Validation
- Appendix H - Simulation Coding Guidance
- Appendix 3C - PT Model Validation
- Appendix 3D - Demand Model Development
- Appendix 3E - Forecasting Report
- Appendix 3E(i) - Passenger Demand Forecasting and Analysis
- Appendix 3F - Environmental Assessment Scoping Report
- Appendix 3F cover
- Revised scoping report for issue 26.09.08
- Revised scoping report for Issue 260908Appendicies
- Appendix 3F (i) - Consultation Responses from Statutory Bodies
- Appendix 3F (ii) - Environmental Assessment
- Appendix 3F (ii) Draft Environmental Report Appendicies
- Appendix 3F (ii) Draft Environmental Report
- Appendix 3F (ii) cover
- Appendix 3G - Safety and Economic Analysis including NATA workshop
- Appendix 3H - Accessibility Analysis
- Appendix 3I - Integration Analysis
- Appendix 4A - Project Plan
- Appendix 4B - Risk Register
- Appendix 4C - QRA
- Appendix 4D - West of England Transport Branding
- Appendix 4E - Consultation Report
- Appendix 4E cover
- BIA letter of support
- Business West letter of support
- Final consultation report
- First
- Quarterly Newsletter October 2008
- Rapid Transit Consultation brochure
- Rapid Transit Consultation Invite
- Rapid Transit Consultation Leaflet
- SWRA letter of support
- SWRDA letter of support
- Wessex Connect letter of support
- Appendix 4F - BCC Statement of Community Involvement
- Appendix 4G - Stakeholder Summary
- Appendix 5A - Support from PT Operators
- Appendix 6A - Independent Surveyor's Report
- 20016 Appendix A
- 20016 Appendix B
- Appendix 6A cover
- WoERT Cost Overview Report rev A 13.03.09
- 20016 Appendix C
- 20016 Appendix D
- Appendix 6B - Capital Cost Estimates

